National Airport FaCade and Window Repair
Project Details
Owner: Metropolitan Washington Airports Authority
Contract Amount: $9,207,321
Date of Award: 8/31/06;
Admin NTP - 11/8/06;
Construction NTP - 3/5/07
Date of Completion: August 29, 2008
Architect: Shalom Baranes Associates
Washington, DC

Grunley Construction provided façade renovation, restoration, and replacement services at the original 1940's circa Terminal of Ronald Reagan Washington National Airport. The scope of the project included:
- Facade repair and restoration, including paint removal, realkalization of concrete surfaces, repair of concrete and recoating of concrete surfaces, primarily at the landside facades of the historic Terminal A building.
- Restoration of original light fixtures on columns.
- Restoration of ceiling mosaic artwork and decorative concrete walkway.
- Building lettering on the outside of the building.
- Window replacement and reinforcement at the 1941 portion of Terminal A building.
The building remained occupied throughout the construction process. Portions of work were performed at night.
Date Posted: September 24, 2008