Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
This 130000 square foot project within an existing post office building at National Airport required the gutting of existing offices demolition of mezzanine space and structure and the construction of new office space and two story open bay space for baggage handling testing systems infrastructure for the Transportation Security Agen- cy TSA. The work included two garage areas with loading docks for vehicles to access the facility and transport the baggage screening systems infrastructure. Grunley was the construction contractor for the baggage handling system design-build integrator Vic Thompson Company. The TSA leased the 130000 square foot space to create a testing capability that can emulate operational environments in order to integrate and evaluate technologies processes procedures and staff. The facility supports the TSA Office of Security Tech- nology in this effort. The space provides a testing atmosphere for different baggage and passenger screening technologies including outbound passengers baggage and cargo movement from arrival to departure. The space is a two-story open warehouse style structure. This project was executed using a phased design and construction process. In order to meet the aggressive schedule much of the baggage handling systems equipment was installed prior to the completion of surrounding finishes and MEP infrastructure. Included in the work was the modification of the existing elevator shaft and replace- ment of the elevator cab masonry walls finishes mechanical electrical fire alarm and lighting controls to meet energy efficiency goals. TRANSPORTATION SECURITY ADMINISTRATION OPERATIONAL TESTING FACILITY INTERIOR BUILD-OUT Ronald Reagan Washington National Airport Arlington VA OWNER Metropolitan Washington Airports Authority DATE OF AWARD April 2008 COMPLETION DATE December 2008 CONTRACT AMOUNT 8M ARCHITECT Michael Winstanley Architect Planners